ZHANGJIAGANG FLAME MACHINERY COMPANY
|
Gold Index: 6844
Place of Origin: | Zhejiang, China (Mainland) |
Add to My Favorites | |
HiSupplier Escrow |
1.Introduction of Product
16-63mm PVC Double Electrical Threading Pipe Extruding Production Line
The production line is developed by absorbing 1990’ West European advanced technology. Main machine is SJSZ 51/105 or SJSZ65/132 cone double screws squeezer, equipped with double tubes single-controlled stainless steel spraying shaper. When one tube is being adjusted, the another will not be affected. Automatic single-controlled double tractor and cutter are mixed together with previous double shaping technology, which makes the operation easier. You can separately control and make double tubes work at the same time.
2.Quick Detail:
Raw material+additive→mixing→conveying feeding→force feeding→conical double screw extruder→one module two pipe mould→calibrator→double spray vacuum calibration tank→ink printer→double belt haul-off→double uplift cutter→double pipe rack→finished product inspecting & packing
3.Description:
Max output of extruder(Kg/h) |
150-250 |
Vacuum tank length(mm) |
6000 |
Haul-off speed(m/min) |
0-15 |
Max diameter of twin pipe(mm) |
16-63 |
Haul-off force(N) |
2000 |
Drive motor power(Kw) |
4×2 |
Saws motor power(Kw) |
1.1×2 |
Sawa motor revolution speed(r/min) |
2800 |
4.Applications:
Mainly applying in water-supply pipe, drainage pipe, electrical threading pipe and other area.
5.Specifications:
Extruder modle |
Pipe range |
Output |
Total power |
Line length |
SJSZ-51/105 |
16-40mm |
80-120 Kg/h |
50KW |
20000mm |
SJSZ-65/132 |
16-63mm |
120-250Kg/h |
100Kw |
22000mm |
6.Competitive Advantage:
The production line is developed with the advanced technology of West Europe by our company. The main machine is SJSZ 51/105 or SJSZ65/132 conical twin screw extruder is equipped with double-tube single-control stainless steel spraying calibration. It avoids waste combined with the front double calibration technology to make operation more flexible. Let you enjoy economic benefit which is brought by separate-control double-tube extruding.
7.Service:
1. Oversea installation guide.
2. Oversea test running
3. Ovsersea worker training
4. Technical support
5. Spare parts supply
6. Technical operation support
7. Formula and processing support
8. Option
The line is mainly for producing PVC-U pipes for wire and cable.
It can extrude two pipes at one time, which enhances production efficiency dramatically.
Each pipe is hauled off and cut individually, which effectively lowers unqualified ratio in pipe production.
9. Commercial Terms
1. Payment: 30% by T/T as advance payment, balance(70%) by T/T before shipment
2. Lead Time: 60 days after receiving the advance payment
3. Transportation: container, simple package ( PE film, salver)
4.Warranty period: From the day of the use of the machine in the buyer’s factory:
(1) The mechanical Parts: 12 months
(2) The electrical Parts: 6 months
5. Installations and Commissioning
(1) Up to date commissioning has been made before shipment
(2) Overseas Commissioning and charges
one or two technicians will be sent to the buyer to guide the installation and commissioning of the equipment if the customer requests.
Customers pay the charge of our technicians.
(1) Round-trip Airplane Ticket
(2) Charges of transportation, accommodation and communication
(3) The allowance for the technicians is USD 80 per day for one person.
(4) An interpreter is needed.
6. Spare parts:
Spare parts for one year are needed for the customers, and we suggest that customers should buy the spare parts. (Fittings list will be provided.)
7. English manual, Figuration drawing, and footing drawings are provided.
ZHANGJIAGANG FLAME MACHINERY COMPANY [China (Mainland)]
Business Type:Manufacturer
City: Lianyungang
Province/State: Jiangsu
Country/Region: China (Mainland)